Road & Bridge Construction Projects

The County of Glenn has over 200 bridges in its maintained system with many of them reaching their useful life and in need of replacement or major rehabilitation.  Using a combination of Local, State and Federal funds Glenn County currently has more than a dozen bridge projects in design or construction.

Road & Bridge Construction Projects (Map)

Road/Bridge From To Note or current phase
Bridge at County Road R .3 mi N of CR 39 @ Canal Bridge 11C - 0011 Replacement, Phase=PE
County Road 44 @ Colusa Drain near CR X County Road XX Replacement, Phase=Const, renewing permits
Bridge at CR 200A @ Stony Creek Bridge 11C - 0245 Replacement, Phase=PE
County Road 35 @ Walker Creek Low Water Crossing Replacement, Phase=PE
County Road 35 @ Wilson Creek Low Water Crossing Replacement, Phase=PE
Bridge at County Road 67 1.3 mi E of CR Z @ Howard Slough Bridge 11C - 0015 Replacement, Phase=PE
Bridge at County Road 67 1.7 mi E of CR Z @ Howard Slough Bridge 11C - 0016 Replacement, Phase=PE
Bridge at County Road 67 1.8 mi E of CR Z @ Howard Slough Bridge 11C - 0017 Replacement, Phase=PE
Bridge at County Road 67 1.9 mi E of CR Z @ Howard Slough Bridge 11C - 0179 Replacement, Phase=PE
Bridge at County Road 305 @ Watson Creek near Grindstone Bridge 11C - 0091 Replacement, Phase=PE
Bridge at County Road 200 @ Branch Salt Creek Bridge 11C - 0132 Replacement, Phase=PE
Bridge at County Road 303 @ S. Fork Willow Creek Bridge 11C - 0163 Replacement, Phase=PE
Bridge at County Road 303 @ S. Fork Willow Creek Bridge 11C - 0162 Applying for replacement funds
Bridge at County Road 66 @ Colusa Drain Bridge 11C - 0068 Replacement, Phase=PE

PE=Preliminary Engineering, ROW=Right-of-Way, CE=Construction Engineering, CON=Construction